Factores determinantes en la eficacia del proceso de seguimiento y evaluaciĆ³n del sistema de control interno, en la Municipalidad Provincial del Cusco, periodo 2021-2022 y semestre del 2023

dc.contributor.advisorMedianero Burga, Elpidio Davides_PE
dc.contributor.advisorMarco Antonio ArgandoƱa DueƱases_PE
dc.contributor.authorNĆŗƱez Del Prado Coll CĆ”rdenas, Marco Antonioes_PE
dc.date.accessioned2024-11-08T16:35:51Z
dc.date.available2024-11-08T16:35:51Z
dc.date.embargoEnd2024
dc.date.issued2023
dc.description.abstractLa adecuada implementaciĆ³n del Sistema de Control Interno (SCI) en los gobiernos locales es un reto pendiente en la administraciĆ³n pĆŗblica. El presente trabajo de investigaciĆ³n, realizado en el marco de la MaestrĆ­a en Control Gubernamental de la Escuela Nacional de Control de la ContralorĆ­a General de la RepĆŗblica (CGR) del PerĆŗ, estĆ” orientado a contribuir a que la Municipalidad Provincial del Cusco (MPC) adopte medidas concretas para una efectiva implementaciĆ³n del Plan de AcciĆ³n Anual (PAA), en el marco del SCI, y asĆ­ optimizar su gestiĆ³n a partir del diseƱo e implementaciĆ³n de las medidas de remediaciĆ³n y control. De acuerdo con los alcances contenidos en la normativa de Control Interno. De esta manera, se espera contribuir a la correcta utilizaciĆ³n y destino de los recursos pĆŗblicos asignados a esta importante entidad pĆŗblica, donde la MPC durante el 2021 ejecutĆ³ un presupuesto de mĆ”s de S/ 300 millones. En tĆ©rminos generales, la investigaciĆ³n busca extraer lecciones de la experiencia de la MPC, con el propĆ³sito de contribuir al proceso de implementaciĆ³n del PAA en el marco del Sistema de Control Interno, de acuerdo con las normas y directivas de la CGR, contribuyendo asĆ­ a el cumplimiento de los objetivos de control interno en la MPC, asĆ­ como, en el rol de supervisor de la CGR, labor de la ContralorĆ­a General de la RepĆŗblica. Esto tiene pleno sentido si se toma en consideraciĆ³n la existencia de ciertos factores que interviene en el proceso de seguimiento, y evaluaciĆ³n son considerados insuficientes, de acuerdo con los informes de servicios relacionados de la OCI. y con un nivel limitado de participaciĆ³n de los colaboradores, de acuerdo con los resultados obtenidos en la encuesta aplicada a los actores participantes en la gestiĆ³n del SCI de la MPC para el aƱo 2021 - 2022. Y primer semestre 2023. A la luz de este contexto, la investigaciĆ³n ha determinado algunos aportes, sobre algunos de los factores fundamentales que impactan el proceso de seguimiento y evaluaciĆ³n de la implementaciĆ³n del PAA, especialmente en lo que corresponde a los ejes: GestiĆ³n de Riesgos, Cultura Organizacional y SupervisiĆ³n. En esta lĆ­nea, se han analizado detenidamente las variables que actĆŗan para la implementaciĆ³n del Plan de AcciĆ³n Anual (PAA) de la Entidad de Control y PrevenciĆ³n (MPC) en el aƱo 2021 y 2022. Y primer semestre 2023. El presente trabajo contiene propuestas, como un conjunto de medidas especĆ­ficas que, si se implementan de manera efectiva, contribuirĆ”n al proceso de seguimiento, evaluaciĆ³n e implementaciĆ³n, y el consiguiente fortalecimiento al SCI de la MPC. dentro del marco del Sistema de Control Interno (SCI). Este enfoque se centra en los gobiernos locales de PerĆŗ. Para lo que se considerĆ³ la MPC, en el periodo 2021-2022. Y primer semestre 2023. En particular, antes de llevar a cabo el seguimiento y evaluaciĆ³n del SCI implementaciĆ³n y seguimiento del PAA en la MPC, es importante resaltar el mismo proceso de formulaciĆ³n del PAA. Donde estos factores son determinantes, ya que afectan y restringen la calidad y oportunidad de los servicios que se ofrecen por parte de la MPC a la ciudadanĆ­a. La percepciĆ³n de los ciudadanos sobre si se cumplen o no sus expectativas se encuentra estrechamente vinculada a las intervenciones pĆŗblicas, provisiĆ³n de bienes y servicios proporcionados por la entidad. Los resultados de esta investigaciĆ³n se basan en la informaciĆ³n recopilada, de los reportes emitidos durante los aƱos 2021-2022. Y primer semestre 2023., que han servido como insumo para el estudio. Se recomienda encarecidamente que estos resultados sean compartidos tanto con la MPC y la ContralorĆ­a General de la RepĆŗblica (CGR). Es esencial destacar la importancia de realizar un efectivo proceso de seguimiento, evaluaciĆ³n de la implementaciĆ³n del PAA, para asegurar el logro del objetivo del SCI, donde se advierte la necesidad de una identificaciĆ³n precisa de los riesgos y deficiencias a ser consideradas en los PAA y asĆ­ contribuir con la gestiĆ³n de la MPC Estos objetivos se sugieren ser definidos con la participaciĆ³n de personal capacitado y, en la medida de lo posible.es_PE
dc.description.abstractThe adequate implementation of the Internal Control System (ICS) in local governments is a pending challenge in public administration. The present research work, carried out within the framework of the Master's Degree in Government Control of the National School of Control of the Comptroller General of the Republic (CGR) of Peru, is aimed at contributing to the Provincial Municipality of Cusco (MPC) adopting concrete measures for an effective implementation of the Annual Action Plan (PAA), within the framework of the SCI, and thus optimize its management based on the design and implementation of remediation and control measures. In accordance with the scope contained in the Internal Control regulations. In this way, it is expected to contribute to the correct use and destination of public resources assigned to this important public entity, where the MPC during 2021 executed a budget of more than S/ 300 million. In general terms, the research seeks to draw lessons from the MPC experience, with the purpose of contributing to the implementation process of the PAA within the framework of the Internal Control System, in accordance with the standards and directives of the CGR, thus contributing to compliance with internal control objectives in the MPC, as well as, in the role of supervisor of the CGR, the work of the Comptroller General of the Republic. This makes complete sense if one takes into consideration the existence of certain factors involved in the monitoring and evaluation process that are considered insufficient, according to the OIC related services reports. and with a limited level of participation of collaborators, according to the results obtained in the survey applied to the actors participating in the management of the SCI of the MPC for the year 2021 - 2022. And first semester 2023. In light of this context, the research has determined some contributions on some of the fundamental factors that impact the monitoring and evaluation process of the implementation of the PAA, especially in what corresponds to the axes: Risk Management, Organizational Culture and Supervision. Along these lines, the variables that act for the implementation of the Annual Action Plan (PAA) of the Control and Prevention Entity (MPC) in the year 2021 and 2022 have been carefully analyzed. And first semester 2023. This work contains proposals, such as a set of specific measures that, if implemented effectively, will contribute to the monitoring, evaluation and implementation process, and the consequent strengthening of the SCI of the MPC. within the framework of the Internal Control System (SCI). This approach focuses on local governments in Peru. For what the MPC was considered, in the period 2021-2022. And first semester 2023. In particular, before carrying out the monitoring and evaluation of the SCI, implementation and monitoring of the PAA in the MPC, it is important to highlight the same process of formulating the PAA. Where these factors are decisive, since they affect and restrict the quality and opportunity of the services offered by the MPC to citizens. Citizens' perception of whether or not their expectations are met is closely linked to public interventions, provision of goods and services provided by the entity. The results of this investigation are based on the information collected from the reports issued during the years 2021-2022. And first semester 2023., which have served as input for the study. It is strongly recommended that these results be shared with both the MPC and the Comptroller General of the Republic (CGR). It is essential to highlight the importance of carrying out an effective process of monitoring and evaluating the implementation of the PAA, to ensure the achievement of the objective of the SCI, where the need for a precise identification of the risks and deficiencies to be considered in the PAA and thus contributing to the management of the MPC. These objectives are suggested to be defined with the participation of trained personnel and, to the extent possible.es_PE
dc.description.tableofcontentsResumen -- IntroducciĆ³n ā€“ Planteamiento del problema. Pregunta y objetivos de la investigaciĆ³n -- Marco conceptual: estado del conocimiento ā€“ DiseƱo metodolĆ³gico ā€“ Resultados y anĆ”lisis ā€“DiseƱo de la propuesta de soluciĆ³n ā€“ Conclusiones y recomendaciones.es_PE
dc.formatapplication/pdfes_PE
dc.identifier.citationNĆŗƱez Del Prado Coll CĆ”rdenas, Marco Antonio. (2023). Factores determinantes en la eficacia del proceso de seguimiento y evaluaciĆ³n del sistema de control interno, en la Municipalidad Provincial del Cusco, periodo 2021-2022 y semestre del 2023. [Trabajo de InvestigaciĆ³n, ContralorĆ­a General de la RepĆŗblica. Escuela Nacional de Control]. Repositorio de la Escuela Nacional de Control.es_PE
dc.identifier.urihttps://repositorio.contraloria.gob.pe/handle/ENC/178
dc.language.isospaes_PE
dc.publisherContralorĆ­a General de la RepĆŗblica. Escuela Nacional de Controles_PE
dc.publisher.countryPEes_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/es_PE
dc.sourceContralorĆ­a General de la RepĆŗblicaes_PE
dc.sourceRepositorio Institucional - CGRes_PE
dc.subjectSistema de Control Internoes_PE
dc.subjectGestiĆ³n de riesgoses_PE
dc.subjectAdministraciĆ³n pĆŗblicaes_PE
dc.subjectCultura organizacionales_PE
dc.subjectMedidas de controles_PE
dc.subjectMedidas de remediaciĆ³nes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#5.06.02es_PE
dc.titleFactores determinantes en la eficacia del proceso de seguimiento y evaluaciĆ³n del sistema de control interno, en la Municipalidad Provincial del Cusco, periodo 2021-2022 y semestre del 2023es_PE
dc.typeinfo:eu-repo/semantics/masterThesises_PE
dc.type.versioninfo:eu-repo/semantics/publishedVersiones_PE
renati.advisor.dni08592177
renati.advisor.dni06246295
renati.advisor.orcidhttps://orcid.org/0000-0002-3886-7617es_PE
renati.advisor.orcidhttps://orcid.org/0000-0003-2863-5334es_PE
renati.author.dni23904988
renati.discipline417637es_PE
renati.jurorSifuentes Sifuentes, Michel Anheloes_PE
renati.jurorHuari Sulluchuco, Carlos Williames_PE
renati.jurorPajares GĆ³mez, Gustavoes_PE
renati.levelhttps://purl.org/pe-repo/renati/nivel#maestroes_PE
renati.typehttps://purl.org/pe-repo/renati/type#trabajoDeInvestigaciones_PE
thesis.degree.disciplineMaestrĆ­a en Control Gubernamentales_PE
thesis.degree.grantorContralorĆ­a General de la RepĆŗblica. Escuela Nacional de Controles_PE
thesis.degree.nameMaestro en Control Gubernamentales_PE

Archivos

Bloque original
Mostrando 1 - 4 de 4
No hay miniatura disponible
Nombre:
TIA FINAL-MANdP.pdf
TamaƱo:
1.95 MB
Formato:
Adobe Portable Document Format
DescripciĆ³n:
No hay miniatura disponible
Nombre:
AutorizaciĆ³n.pdf
TamaƱo:
2.61 MB
Formato:
Adobe Portable Document Format
DescripciĆ³n:
Documento restringido.
No hay miniatura disponible
Nombre:
Informe ENCP.pdf
TamaƱo:
451.55 KB
Formato:
Adobe Portable Document Format
DescripciĆ³n:
Documento restringido.
No hay miniatura disponible
Nombre:
Reporte de similitud.pdf
TamaƱo:
19.36 MB
Formato:
Adobe Portable Document Format
DescripciĆ³n:
Documento restringido.
Bloque de licencias
Mostrando 1 - 1 de 1
No hay miniatura disponible
Nombre:
license.txt
TamaƱo:
1.71 KB
Formato:
Item-specific license agreed upon to submission
DescripciĆ³n:
logo enc

Jr. BartolomƩ Herrera #255 - Lince
informes@enc.edu.pe
Central TelefĆ³nica +511 200 8430
Anexo: 4072

logo contraloria

Jr. Camilo Carrillo 114 - JesĆŗs MarĆ­a
Lima - PerĆŗ
Central TelefĆ³nica +511 330 3000